Super Base Instructions |
|
|
Click HERE to download these
instructions in printable PDF format
SUPER BASE TWO
PART EPOXY
SKATE FLOOR BASE COATING
ON ASPHALT, CONCRETE OR PARTICLE
BOARD FLOORING
Before You Begin
Super Base Two-Part Epoxy
was designed as a base coating to be used to smooth
asphalt, concrete and particle board surfaces and is
not intended to be used as a skate floor coating.
Roll-On Skate Floor Finish over Super Base insures
the best possible skating surface.
Storage
Preparation
NOTE :
Shut down all sources of flame around the area where
Super Base is to be used. Do not mix or apply near open
flame or operating sparking system.
When mixing Super Base,
it may be necessary to use an electric mixer.
1. Before combining
Part A and Part B, stir each part with a mixing
paddle for a minimum of 5 minutes or until all
solids are thoroughly mixed.
2.
Wash a new
galvanized trash can completely with dish
soap and warm water, rinse thoroughly and let dry.
Pour
equal amounts of Part A and Part B into a 20 gallon
(or larger) GALVANIZED trash
container. DO NOT USE
RUBBER TRASH CONTAINERS.
Maximum amount to be mixed -- 10 gallons per
container.
3. Stir mixture with
a mixing paddle for a minimum of 5 minutes per
container or until completely blended.
4. Allow mixture to
cure in the 20 gallon container for 45 MINUTES
before applying. Once mixed, Super Base has
a maximum pot life (the useful liquid life of the
epoxy after it has been mixed) of 4 hours at 68 to
72 degrees (F). When mixing smaller quantities of
Super Base, please call 1-800-227-8931.
5.
During
the 45-minute curing time, stir mixture briefly
every 10 minutes.
Application with Squeegee
• NOTE:
All surfaces must be properly prepared and cleaned
as outlined in the current Roll-On
Floor Finish Data Publication available from your
nearest Roll On supplier.
RECOMMENDED COATING FOR
UNCOATED SURFACES:
Concrete: 4 to 5
coats
Particle Board: 5 to
6 coats
Asphalt: 10 coats
1. Squeegee surface
using normal squeegee technique.
2. Allow a minimum of
4 hours drying time between each coat. (All drying
times are estimated and are based upon a recommended
building temperature of 68 to 72 degrees (F).)
3. After the third
coat, allow 12 hours drying time.
4.
LIGHTLY CLEAN AND SAND SUPER BASE
SURFACE AS FOLLOWS:
-
After third coat,
sand surface by using No. 60 grit sand paper
under one or more large floor polishers.
-
After sanding,
drag the surface carefully by soaking a large
terrycloth towel in a bucket of
CLEAR WATER.
-
(DO NOT USE
MINERAL SPIRITS, DETERGENTS, OR SOLVENTS.)
-
Wring out and
wrap the towel around a 24" or 36" push broom.
Push the towel across the width of the skating
surface (not the length). Upon reaching the
other side, turn the towel over so that the
clean wet side is face down on the surface and
push it back to the other side. Overlap a little
for a cleaner surface.
REPEAT THIS PROCESS UNTIL THE FLOOR
IS DUST- FREE.
5. Squeegee
additional coats until the remaining product has
been used. (NOTE: For asphalt,
additional sanding and cleaning is required after
coat No. 6 and coat No. 9.)
6. After final
application of Super Base, allow a minimum of 12
hours drying time before sanding and cleaning the
surface.
7. Before applying
Roll-On skate floor finish, obtain the current
Data Publication (Roll-On Floor Finish over
Coated Floors) from your supplier.
Application with Airless Spray
NOTE :
Minimum of two spray coats required.
1. Pour mixture into
a thoroughly cleaned airless sprayer container.
2. Using 15/1000
orifice, spray entire skating surface at a
controlled rate of 200 square feet per gallon.
ESTIMATED TIME OF APPLICATION: 2 hours
per 10,000 square feet.
3. Once spray
application begins, it must continue until the
entire surface has been coated.
4. Allow the first
coat to dry a minimum of 18 hours, keeping the room
at a temperature of 68 to 70 degrees (F) with good
building ventilation during this time.
5. Once the floor is
dry, lightly sand and clean Super Base surfaces as
follows:
-
SANDING:
Sand surface by using 60 grit sand paper under
one or more large floor polishers.
-
CLEANING:
After sanding, drag the surface
carefully by soaking a large terrycloth towel in
a bucket of CLEAN
WATER.
-
DO NOT USE
MINERAL SPIRITS, DETERGENTS, OR SOLVENTS.
-
Wring out and
wrap the towel around a 24" or 36" push broom.
Push the towel across the width of the skating
surface (not the length). Upon reaching the
other side, turn the towel over so that the
clean wet side is face down on the surface and
push it back to the other side. Overlap a little
for a cleaner surface.
REPEAT THIS PROCESS
UNTIL THE FLOOR IS COMPLETELY DUST-FREE.
6. Apply a second
spray coat of Super Base Epoxy. (NOTE:
To determine if additional coats are necessary,
refer to the "Estimated Gallons Used...")
7. After each
application of Super Base, allow 18 hours drying
time.
8. Sand and clean
between each airless spray application as described
above.
9. Before applying
Roll-On skate floor finish, obtain the current
Data Publication (Roll-On Floor Finish Over
Coated Floors) from your supplier.
Helpful Hints
-
Clean equipment and
hands immediately with warm water and mild
detergent.
-
When sanding between
coats, change sand paper every 500 square feet or
less.
-
Always store sanded
material in a sealed metal container.
-
When spraying, use
available building markings to help control coverage
(i.e. wall joints, beams or posts).
-
A controlled floor
temperature of 68 to 72 degrees (F) is essential
during the application and curing of Super Base
Epoxy.
Click HERE to download these
instructions in printable PDF format |
|
| Roll-On (r) Skate
Floor Finish, Super Base(r), Traction(r) Skate Floor
Finish is a trademark of Roll-on Floor Systems, LLC. All
other products mentioned are registered trademarks or
trademarks of their respective companies.
Questions or problems
regarding this web site should be directed to
service@roll-on.com
Copyright © 2009-2011 Roll-on Floor Systems, LLC. All
rights reserved. |
|